Khimji Ramdas Export 1500 HP Rig from Oman to Philippines
26th April 2024
Khimji Ramdas Shipping, our members from Oman, recently executed the multimodal shipment of a 1500 HP geothermal rig and its accessories.
The shipment consisted of 144 pieces at a volume of 7,000cbm. A total of 85 trailer-loads of varying sizes and shapes were utilised for the transport.
Khimji Ramdas Shipping took charge of all operations in Oman, including:
- Route Survey for the Over-Dimensional Cargo
- Packing List Preparations
- Segregation & Labelling
- Customs Clearance
- Port Handling
- Cargo Sorting
- Loading
- Haulage
- Marine Warranty Surveyor Arrangements
The geothermal rig was crated and packed to be seaworthy by Khimji Ramdas' professional packing partner team, who were relocated to Oman for this specific project over twenty-five days.
Marine Warranty Surveyors were appointed and observed the creation of the rig packing list & packaging process.
The shipment was executed with a plan to move 85 truck loads from Nizwa and Muscat to a storage yard in the area of Sohar Port. This was to counter the shortage of storage space in the shipper's yard.
In execution of the haulage, the team had to negotiate a number of challenges, with the major one being preparation of customs documentation and the packing list.
The geothermal rig is to be refurbished in Oman with cargo arriving from multiple countries of origin. Customs declarations were required to be made separately for the Oman and non-Oman made cargo. Khimji Ramdas' customs documentation team worked with the shipper and identified each cargoes' origin to solve this challenge successfully.
Due to the fully-assembled condition of the rig, it required dismantling and the packing list preparation proposed another challenge. However, Khimji Ramdas employed the services of a professional surveyor to measure the dimensions and weight of each piece to overcome this challenge.